Completed projects

Shopping Center - MALTA Poznań

General contractor: HOCHTIEF POLSKA Sp. z o.o.

Period of completion: 3 March 2008 – 29 May 2009

Scope of work: roof insulation 35 000 m2

                      insulation of the car park slabs – 7 000 m2

details +

Shopping Center - MALTA Poznań

General contractor: HOCHTIEF POLSKA Sp. z o.o.

Period of completion: 3 March 2008 – 29 May 2009

Scope of work: roof insulation 35 000 m2

                      insulation of the car park slabs – 7 000 m2


 

Technology:

  • Delivery and assembly of trapezoidal sheet
  • Delivery and assembly of steam insulation with PE foil
  • Styrofoam profiling of hipped ends of the roof
  • Delivery and assembly of Styrofoam thermal insulation
  • Delivery and assembly of thermal insulation with mineral wool (cinema roofs)
  • Delivery and assembly of bituminous hydroinsulation within the Fire Smart two-layer system – 35 000 m2
  • Delivery and assembly of roof work and roof gutter system
  • Delivery and assembly of two-layer bituminous insulation of the car park slabs – 7 000 m2

less -

Cadbury –Wedel ChocolateProduction Plant

General contractor: Bovis Lend Lease Sp. z o.o.

Period of completion: 3 March 2008 – 20 December 2009

Scope of work: Roof - 50 000 m2  Façade 27 000 m2

details +

Cadbury –Wedel ChocolateProduction Plant

General contractor: Bovis Lend Lease Sp. z o.o.

Period of completion: 3 March 2008 – 20 December 2009

Scope of work: Roof - 50 000 m2  Façade 27 000 m2


 

Technology:

 

ROOF:

  • Complete roof design
  • Delivery and assembly of Pulvia roof dewatering system
  • Assembly of trapezoid sheet
  • Laying of PE foil steam insulation
  • Laying of thermal insulation with mineral wool
  • Assembly of Sikaplan PVC membrane of 1.5mm thickness

 

FAÇADE:

  • Complete façade design
  • Delivery and assembly of a light wall envelope – layer plate with a core of Trimo mineral wool
  • Delivery and assembly of aluminum window and door joinery
  • Delivery and assembly of complete loading docks
  • Delivery and assembly of aluminum and glass façade of approx. 1 000 m2
  • Delivery and assembly of finishing work

less -

Shopping Center – Gliwice

Investor: Helical Sp. z o.o.

General contractor: Polimex- Mostostal S. A.

Period of completion: February 2012 –December 2012

Scope of work: complete performance of roofing 71 000 m2

details +

Shopping Center – Gliwice

Investor: Helical Sp. z o.o.

General contractor: Polimex- Mostostal S. A.

Period of completion: February 2012 –December 2012

Scope of work: complete performance of roofing 71 000 m2


 

 Technology:

  • Delivery and assembly of steam insulation of PE foil of 0.2 mm
    thickness
  • Delivery and assembly of thermal insulation with mineral wool
    of 18 mm thickness
  • Delivery and assembly of hydro insulation with two layers
    of thermo-weldable roofing bituminous membrane,
  • Performance of all necessary finishing works and sealing,
  • Delivery and assembly of roof work of internal attics.

less -

Lubelski węgiel Bogdanka S.A. [Mine]

General contractor: Mostostal Warszawa S. A.

Period of completion: August 2010 – May 2014

Scope of work: complete performance of envelope 103 000 m2

details +

Lubelski węgiel Bogdanka S.A. [Mine]

General contractor: Mostostal Warszawa S. A.

Period of completion: August 2010 – May 2014

Scope of work: complete performance of envelope 103 000 m2


 

Technology:

  • Delivery and assembly of roof and wall layer plates with a core
    of mineral wool together with sealing and complete finishing works
  • Assembly of technical roof devices (ventilators, ventilation grids)
  • Delivery and assembly of thermal insulation and double layer
    bituminous hydro insulation
  • Delivery and assembly of arch roof skylight
  • Delivery of complete set of gutters

 

 


less -

FELICITY Shopping Center - Lublin

Investor: Atrium Felicity Sp. z o.o.

General contractor: STRABAG Sp. z o.o.

Period of completion: December2012– April 2014

Scope of work: performance of roofing and insulation of a car park of 95 640 m2

details +

FELICITY Shopping Center - Lublin

Investor: Atrium Felicity Sp. z o.o.

General contractor: STRABAG Sp. z o.o.

Period of completion: December2012– April 2014

Scope of work: performance of roofing and insulation of a car park of 95 640 m2


 

 Technology:

  • Performance of a technical documentation – projects,
  • Delivery and assembly of trapezoid sheet
    T92/1.0, T92/1.5, T92/1.25, T135/0.88, T150/1.25
  • Delivery and assembly of thermal insulation with mineral wool
    Monrock MAX of 10cm thickness + Dachrock MAX of 8cm thickness
  • Delivery and assembly of hydro insulation of PVC membrane Sikaplan 15G;
    and Sikaplan 20G PVC membrane
  • Assembly of smoke dampers and skylights
  • Performance of all necessary finishing works and sealing,
    Hydro insulation of car park slabs, ceilings

less -

IKEA Distribution Center – Jarosty near Piotrków Trybunalski

General contractor: Hanim Nieruchomości Sp. z o.o.

Period of completion: March 2010 – July 2010

Scope of work: Roof – 46 100 m2 Façade – 22 100 m2

details +

IKEA Distribution Center – Jarosty near Piotrków Trybunalski

General contractor: Hanim Nieruchomości Sp. z o.o.

Period of completion: March 2010 – July 2010

Scope of work: Roof – 46 100 m2 Façade – 22 100 m2


 

 Technology:

 

Roof:

  • Performance of necessary projects,
  • Delivery and assembly of trapezoidal sheet
    T150/0.75, T150/0.88, T150/1.0, T150/1.25, T150/1.5
  • Delivery and assembly of thermal insulation with PIR boards of 10 cm thickness,
  • Delivery and assembly of hydro insulation of TPO mambrane 1.2 mm,
  • Delivery and assembly of smoke dampers and skylights,
  • Performance of all necessary finishing works and sealing,

 

FAÇADE:

  • Performance of necessary projects,
  • Delivery and assembly of steel substructure,
  • Delivery and assembly of layer plates with PIR filler (to the level + 13.86 m),
  • Delivery and assembly of layer plates with mineral wool filler (from level + 13.86 to +34.57m),
  • Performance of all necessary sealing and roof work.

less -